Poly-Hanger 3

  1. Containments for abatement with .02" negative air pressure.
    • To support poly horizontally below grid ceilings, space the hangers at 4' to 6' apart.
    • To support vertical poly for walls, space the hangers at 3' to 4' apart.
  2. Dust curtains and construction enclosures.
    • To support the poly, space the hangers 4' to 6' apart.